Palmerston Park

Start – May 2017 Completion – August 2019 Client – Mid Devon District council Cost – 4.2 Million The project consists of a single block of 4No 2 bed flats and 22No dwellings set over a new development within a residential area in Tiverton. Works consist of a Maccaferi wall and RC retaining walls within the boundary of the site. New entrance works and unadopted access road leading to all… Read more

Appledore

Start – March 2018 Completion – July 2019 Client – ASTER Housing Group Cost – 1.7 Million The Mount is a development of affordable housing for ASTER housing group comprising six two bed houses, one 3 bed house and two 1 bed flats. Works included a large amount of retaining walls with the site set on a very sloping site overlooking the Estuary of Rivers Taw and Torridge. Included in… Read more

Buddle Lane

Start – March 2019 Completion – June 2020 Client – Exeter City Council Cost – 3.1 Million The project comprises the demolition of 17No existing semi-detached Laing’s Easiform properties and re-build with and extended modern 3 bedroomed dwelling and associated drainage works. Works incorporate the installation of designed temporary propping of existing party wall throughout the new build and diversion of existing South West Water combined sewer.

Henver Road, Newquay

Start – January 2019 Completion – October 2019 Client – Cornovia Homes Cost – 1.15 Million The project consists of a single apartment block set over 4 floors, the ground, first and second floors each have 3 apartments with the layout of these floor levels being identical, the third floor is a single penthouse type flat. The construction is timber frame with an external concrete block clad in render and… Read more

Falmouth Heights

Client – Apartments for Falmouth 118 bed student accommodation facility Project Value £5.8m Start – April 2019 Completion – June 2020

Riverside

A 17no. 1 bed and 11no. 2 bed apartments and 5no. 2 bed and 7no. 3 bed houses for 3 Rivers developments in Tiverton. We are installing substructure works for the houses and currently installing the reinforced concrete podium deck which supports the apartments.

Thornpark Rise

A development of 9 new build Passivhaus 3 bedroomed houses for Exeter City Living (ECL).  We have 2 structures complete and are working on the masonry on the other 7.

Mitchell Fruit Farm

Client – Coastline 26 Social Housing Units Starts March 2019 Completion Feb 2020

Anthony Road

A development of 3 new build Passivhaus 3 bedroomed terraced houses for Exeter City Living (ECL), wholly owned by Exeter City Council. The structures are complete and are due for completion by the end of September 2019.